2010 Persimmon Homes Blog

Archive for September 2010

It’s been over 4.5 years and still we are waiting, dispute numerous assurances, which have turned out to be nothing buy empty promises.

But the leaks are the smaller issues, the substandard construction of the floor is a much bigger concern to us, and still years after reporting the issues (and Charles Church continuing to build new homes with similar defects) we are still waiting for a proper investigation, and thus for the hope of a fix so we might one day be able to sell the home, which we originally thought would be a safe investment – how wrong we were.



  • Bob: Perhaps the New Home Builders are enjoying the econmic climate a bit TOO MUCH :(
  • M. Farley: Walked around a new Charles Church Show Home last week, and found same issues discussed above, noisy bouncy floors. when will they fix this? From read
  • Debbie Brown: Neat idea! Can't beat something that makes cake easier to eat and carry.